The WOW Tower by Mr. Eight
Dubai Land Residence Complex, Dubai
Developer-listed units sold out / Dubai
Developer-published visualisation © Arada
Arada’s main-construction announcement targets end-2027. A construction target is distinct from a guaranteed handover appointment.
Project overview
Armani Beach Residences at Palm Jumeirah is developed by Arada, with architecture by Tadao Ando and interiors by Armani/Casa. The project pairs a seafront setting with a design-led residential and amenity programme.
The partnership between Arada, Tadao Ando and Armani/Casa is the defining point of this development. Arada describes two- to five-bedroom home formats and a resident amenity programme that includes a private beach, spa, indoor pool, infinity pool and cinema.
The developer’s reviewed property listing marks its displayed units as sold out. That is treated as a meaningful limitation, not hidden behind a generic booking button. An enquiry here should establish whether there is a new release, a documented resale opportunity or a more suitable alternative; it is not a promise of developer stock.
The architect is named on Arada’s official project page.
The interior design partner is identified by the developer.
The residential scheme is positioned on the island’s seafront.
The reviewed developer property list marks its displayed units sold out.
From the published project information
Nearby community facilities and facilities inside a building are different. Confirm access and inclusions for the chosen home.
Price context, then payment timing
Ask for a current unit-specific quotation. No live inventory feed is connected.
The republished December 2025 availability schedule sets out 10% immediately, 35% across reservation-linked instalments and 55% on completion. Other releases used different plans. The developer-listed homes reviewed are sold out, so this dated schedule is research context, not an available developer offer or a promised resale plan.
| Instalment | Share | Published timing |
|---|---|---|
| Down payment | 10% | Immediate · reservation |
| 1st instalment | 10% | Within 150 days of reservation |
| 2nd instalment | 5% | Within 270 days of reservation |
| 3rd instalment | 5% | Within 390 days of reservation |
| 4th instalment | 5% | Within 480 days of reservation |
| 5th instalment | 5% | Within 570 days of reservation |
| 6th instalment | 5% | Within 660 days of reservation |
| Final instalment | 55% | On completion |
| Total | 100% | Purchase price; fees separate |
A location worth understanding
Palm Jumeirah, Dubai
The project is at Palm Jumeirah in Dubai. Buyers should assess the building’s approach and the relationship between the selected residence, beach and shared amenities, rather than assuming every home has the same orientation or view.

View the surrounding area and nearby connections.
The bigger picture

Ask for the latest drawing for Armani Beach Residences to check building positions, access and shared facilities.
Compare the actual home
Selected unit examples from the republished December 2025 availability report. This dated sample is not the full building-wide size range and does not establish present availability; the developer listing reviewed marks displayed homes sold out.
| Home type | Bedrooms | Published size | Basis |
|---|---|---|---|
| Apartment B-502 | 2 | 2,623 sq ft | December 2025 saleable-area example |
| Apartment A-603 | 3 | 4,676 sq ft | December 2025 saleable-area example |
| Apartment A-701 | 4 | 6,331 sq ft | December 2025 saleable-area example |
| Apartment B-602 | 5 | 8,438 sq ft | December 2025 saleable-area example |
| Presidential Suite C-901 | 5 | 31,680 sq ft | December 2025 saleable-area example |

Two-bedroom sample with the balcony measured separately.
Sheraz Properties buyer perspective
Buyers who place particular weight on architectural authorship and a branded interior environment may want to investigate a documented opportunity or compare alternatives.
Establish an actual available unit before discussing a deposit. Arada’s construction reporting targets completion in 2027; obtain the latest written programme rather than treating that target as a guarantee.
The buyer perspective is editorial analysis. It is separate from the developer’s published project specifications.
The project developer
See the developer’s role and other researched projects in this collection.
Developer ProfileQuestions specific to this project
No. Arada’s reviewed property list marks displayed units sold out. Ask about a documented resale, any later release or alternative projects.
Arada’s construction news identifies end-2027 delivery, and its 2026 update reiterates a 2027 target. The latest contractual schedule should be checked for the specific purchase.
The reviewed September 2024 and December 2025 schedules belong to different dated offers. This profile shows the December 2025 10/35/55 schedule as historical context. A resale or a later offer requires its own written remaining-payment statement.
Project information was reviewed on 2026-10-31. Published prices, availability and construction targets can change; obtain current unit-specific documentation before booking.
Continue your research
Dubai Land Residence Complex, Dubai
Jumeirah Village Triangle, Dubai